Projects

Leeville Rail Viaduct   Transport Express Joint Venture (TEJV) constructed a new rail bridge in 2007 on the floodplain 10 kilometres south of Casino.

The Leeville rail viaduct is a 505 metre long construction replaces the old viaduct that was built in the 1925. BCP Precast supplied the project with 3500 tonnes of precast concrete comprising 135 individual spans, over 1200 precast concrete elements.

Bookmark and Share

 

Privacy | Terms | Site map | Bookmark & Share | Subscribe